Posted inNews

Moss asks that ‘let it flood’ option be studied in Big Dig plan 

In an effort to leave no stone unturned in getting the lowest price possible, engineers are being asked to study what might be called a ‘let it flood’ scenario for fighting rising seas and persistent street flooding in Key Biscayne 

The newest option, which came at the request of Council Member Brett Moss, would allow for so much street flooding that only emergency vehicles could traverse village streets at the peak times of a deluge. Streets would be filled with as much as 14 inches of water not to exceed 12 hours.